Our collaboration with Tomorrows Flooring to raise awareness in the floor screeding industry continues with the next instalment of the Screed Scientist content appearing in the September 2013 edition. See page 22 of this link: http://content.yudu.com/A2dukg/TFSept13/resources/index.htm?referrerUrl=http%3A%2F%2Fwww.tomorrowsflooring.com%2F
The article covers:
Right from verifying the suitability of the screed specification before commencing screeding to the post-installation measures of curing and screed protection – there are a number of areas where supervision and control are essential on site to ensure the screed meets the expected quality and design standards.
Our original version can be seen here: http://www.screedscientist.com/floor-screeding/checklist-for-onsite-supervision-for-screeding-10-major-areas/