Screed Protection Considerations

Protection to levelling floor screeds should be carried out as soon as possible after installation. This is especially true on large construction sites with where many tradespeople are potentially competing to access the available work areas.

  • The expected traffic type and volume should be considered to determine the type of protection required.
  • Instructions on heavy loadings on to the levelling floor screed should always be sort from a qualified structural engineer.

Taking adequate measures will ensure that the floor remains in perfect condition for the floor finisher to achieve best results.

Please see the image below, what could have possibly caused the screed crack here?

 

This entry was posted in Screeding Tips, The Screed Scientist® and tagged . Bookmark the permalink.

Comments are closed.